How can I access the cost table?
Simply enable the "Show cost table" option by following these steps:
- Go the "Shifts" section from the left-side panel.
- In the schedule view, navigate to the top-right corner of the screen.
- Click the eye icon.
- In the drop-down menu, enable the "Show cost table" switch.
That's it! You'll now see the costs associated with shifts directly in the schedule.

